WorkBuddy 29112eed6e fix(activity): close Phase 15 KEEP-VERIFY/EXTEND — 2 critical + 14 other defects, 3 test-fidelity fixes
Phase 15 (activity registration / review / checkin) verification closure.

Two CRITICAL defects, both "production always had it, test schema never did":
- D1: generateCheckinToken wrote the token to Redis with value "used", while
  scanCheckin rejects any token marked "used" -> every freshly issued check-in
  code was dead on arrival, staff scanning failed 100% of the time.
  Issuing now writes "issued"; "used" is set only after a successful scan.
- D9: UNIQUE(activity_id, user_id) exists in production, but re-registering
  after cancel/reject went through INSERT -> users who cancelled once could
  never register for that activity again (duplicate key 500). The H2 test
  schema lacked the UNIQUE, so the path had zero coverage. Now the original
  row is reused via an atomic conditional UPDATE.

Checkin (D2-D8):
- D2: duplicate check-in was read-then-write; now atomic checkinIfNotCheckedIn
  and repeat scans are idempotent (alreadyCheckedIn) without duplicate audit.
- D3: no data scope at all -> added activity staff assignment (V040) and
  assertCheckinScope; INV-020 (org relation grants nothing).
- D4: manualCheckin did not validate activity existence/cancellation.
- D5: getCheckinStats NPE on missing activity; remainingCount was semantically
  "free seats" -> replaced with notCheckedInCount.
- D6: malformed timestamp caused 500 -> 400. D7: constant-time signature compare.

Registration / review / cancel (D10-D13):
- D10: backend registration list only queried status='approved' -> the review
  screen never saw pending rows (review unusable).
- D11: registration_start_at / registration_end_at were never enforced.
- D12: cancel had no audit log (the only write without one).
- D13: reject/cancel were read-then-full-update -> rejectIfPending/cancelIfActive.

Capacity groups (D14, plan item 2): groups were stored and read back but never
participated in capacity -> incrementIfAvailable / decrementIfPositive now make
approved_count real; activities without groups are unaffected.

Frontend contract (F1-F2):
- F1: admin-web had no check-in surface at all -> ActivityCheckinView.vue
  (paste/scan token, manual check-in, stats) + /activities/checkin route & nav.
- F2: miniapp had no cancel-registration wrapper although the endpoint existed.

Test fidelity (T1-T3):
- T1: test schema gained UNIQUE(activity_id,user_id) + chk_reg_status +
  chk_checkin_status; two new guards parse the real V010 DDL and compare.
- T2: 3 assertTrue(true) placeholders in CheckinServiceTest (covering duplicate
  check-in, expiry, no-sensitive-plaintext) replaced with 5 real guards that
  parse the real source and real production DDL.
- T3: activity_registrations + activity_staff_assignments moved into
  REQUIRED_IN_TEST_SCHEMA; MigrationValidationTest baseline 39 -> 40.

Note: ActivityStaffAssignment must NOT extend BaseEntity - the table is a
composite PK (activity_id, operator_id); BaseEntity would add id/updated_at/
deleted_at to every INSERT and break on PostgreSQL (caught by
EntityMigrationParityTest immediately).

Tests: ActivityPhase15Test (21), CheckinServiceTest (5), 2 new constraint
guards. Negative verification: 3 injected defects -> 8 assertions turned red,
all restored.

Regression: 474 tests / 0 failures / 0 errors / 3 skipped / BUILD SUCCESS
(baseline 450). admin-web vue-tsc 0 error, vite build OK.
2026-09-17 15:07:52 +08:00
WorkBuddy 755a570849 fix(activity): close Phase 14 KEEP-VERIFY/EXTEND — 11 backend + 3 frontend-contract + 2 test-fidelity defects
Phase 14 (multi-type public-welfare activities) verification closure.

Backend (D1-D11):
- D1 CRITICAL: ActivityMapper.countRemainingCapacity had no @Select and no XML
  -> activity detail / register / approve all threw Invalid bound statement.
  Removed the shell; unified on ActivityRegistrationMapper.
- D2 CRITICAL: register & approve were read-then-write -> oversold under
  concurrency. Replaced with single atomic SQL (insertIfCapacityAvailable /
  approveIfCapacityAvailable, affectedRows==0 => full).
- D3 HIGH: activityType / orgRole never validated against production
  chk_activity_type / chk_org_role -> 500 only on PostgreSQL.
- D4 HIGH: ActivityListItemDTO had no activityType -> miniapp category tabs
  always empty (Gate failure).
- D5: male/female counts were fabricated as approvedCount/2; now real
  aggregation over user_profiles.gender.
- D6: minAge/maxAge was a TODO no-op; added assertAgeInRange.
- D7: registration_policy write-only; per-type eligibility now enforced
  (identity / local eligibility / gender quota).
- D8: POST /operator/activities dropped type, multi-org and capacity groups
  and set organizer_org_id to the operator user id; now delegates to
  createActivityFromAdmin (single implementation).
- D9: three operator write endpoints were mounted on the user-side
  ActivityController (dual implementation, zero callers) -> moved.
- D10: NPE on soft-deleted activity in getMyActivities; NPE/500 on missing
  admin form fields (Instant.parse(null)); tolerant time parsing added.
- D11: DTO lacked registeredCount / status / coverFileId / description
  -> card always showed 0 registered, "view detail", no cover, no summary.

Frontend contract (F1-F3):
- F1: miniapp category code "classroom" is not in the production whitelist
  (should be relationship_education); three types had no tab at all.
- F2: ui-activity-card read 7 fields that do not exist on the backend;
  now reads only real DTO fields, plus per-type badge and eligibility hint.
- F3: admin-web had no activity management page at all; added
  ActivityManagementView.vue (type-driven dynamic form, multi-org,
  capacity groups, publish/cancel) + /activities route and nav entry.

Test fidelity (T1-T2):
- T1: deleted two assertTrue(true) placeholder tests (testNoOverbooking,
  testNoDuplicateRegistration) that covered the exact broken invariants.
- T2: test schema lacked V023 columns/constraints and three tables; the
  activity tables were only in the OPTIONAL set (zero coverage) -> schema
  completed and moved to REQUIRED_IN_TEST_SCHEMA.

Tests: ActivityPhase14Test (23 cases), ActivityConstraintGuardTest (9 cases,
parses real db/migration/V*.sql plus miniapp source). Two negative-verification
rounds proved both guard families actually turn red.

Regression: 450 tests / 0 failures / 0 errors / 3 skipped / BUILD SUCCESS
(baseline 420). admin-web vue-tsc 0 error, vite build OK.
2026-09-17 14:02:00 +08:00
Codex 8b8972a77b test: verify admin reference UI fidelity 2026-09-13 22:09:15 +08:00
Codex 9279359678 feat: rebuild admin shell from reference 2026-09-13 21:39:32 +08:00
admin 564fc88fc8 feat: establish admin visual foundation 2026-09-11 17:02:42 +08:00
admin 45ca118453 feat: deliver V1.1 dual-client UI fidelity milestone 2026-09-10 16:06:11 +08:00
admin 5b51d5b3f1 feat: complete phase 02 RBAC and data scope recovery 2026-09-10 10:58:43 +08:00
admin b46b48eb33 chore: establish V1.1 recovery baseline 2026-09-09 22:05:00 +08:00